Freeland Road Reconstruction
Spicer Group was responsible for providing the design and construction inspection/testing for this project which included over a half mile of full reconstruction in downtown Freeland, MI. The entire roadway was replaced, new curb and gutter was added, and drainage was improved. The road was widened from two lanes to three lanes which improved traffic flow through the downtown area of Freeland and the intersection of M-47. New sidewalks and landscaping were also included with this project.