Village of St. Charles DPW

Spicer Group completed the soil investigation, site development, building design, and construction administration for the new St. Charles Department of Public Works Building. Since the building needed to span nearly 70 feet and had a desired eave height of 16 feet, Spicer recommended a steel rigid frame structure as the best cost-performance solution.

Existing organic soil fill was replaced with structural granular fill material as part of the site development. The L-shaped facility is 10,500-square-feet with a main structure garage of 120’ x 68’ and an office/wash bay area of 64’ x 40’.

Previous
Previous

Thomas Township DPW