Saginaw Charter Township WWTP Expansion
Spicer Group provided Saginaw Charter Township with a complete electrical study that included identifying all required loads for operation of the plant during a utility outage. The study included life cycle cost estimates for a natural gas generator versus a diesel generator to provide emergency power to the plant. The plant operates on a 480 volt, 3 phase, 1200 amp service. A complete cost comparison and estimate for the required loads and size of the generator required were provided to the Township. Spicer Group designed the required upgrades which included a new generator, ATS, control system upgrades and provided site inspection for all improvements.