Gratiot Road Water Main

Spicer Group was responsible for providing the survey, design and construction administration for the installation of 25,000 feet of 20-inch water main along Gratiot Road (M-46) heading west to a new 1.5 million-gallon water tank using the jack-and-bore and horizontal directional drilling process. 1,000-feet of that section was installed beneath the Swan Creek using the horizontal directional drilling process. Additional work included the acquisition of 83 easements.

Previous
Previous

Village of Ashley Water System

Next
Next

Harbor Beach Water System Improvements